もっと詳しく

According to @CCTV’s official WeChat news, on March 31, the hoisting of the No. 9 unit of the Baihetan Hydropower Station was successfully completed. So far, all the large components of the 16 million-kilowatt units of Baihetan Hydropower Station have been hoisted. It is reported in the video that after the completion of the Baihetan Hydropower Station, the 16 units can generate electricity every day, which can provide electricity consumption for 160,000 households in a city for the whole year. It is the second largest hydropower station in the world after the Three Gorges Project. The first batch of units of the power station will be put into operation in June 2021, and all units are planned to be put into operation in July 2022. After being put into operation, it can save about 19.68 million tons of standard coal every year, and reduce the emission of 51.6 million tons of carbon dioxide and 170,000 tons of sulfur dioxide. The benefits of energy saving and emission reduction are remarkable. In addition, after being put into operation, Baihetan Hydropower Station will form the world’s largest clean energy corridor together with Wudongde, Xiangjiaba, Xiluodu and the previously built Three Gorges and Gezhouba Hydropower Stations. It was previously reported that Baihetan Hydropower Station is located at the junction of Ningnan County, Sichuan Province and Qiaojia County, Yunnan Province. It is the largest and most difficult giant hydropower station under construction in the world. The technical index ranks first in the world: – water wheel .
[related_posts_by_tax taxonomies=”post_tag”]

The post The second largest in the world!All large components of Baihetan Hydropower Station were hoisted: 6 first appeared first on Gamingsym.